            Seal Packing Installation Guide
         
        1.Installation preparations
        Removal of the old filler packing box is a kind of pre-inspection preparation for the installation of the key elements.
        Packed with old before they fill all out with special tools to stuffing box. Wipe clean. Stuffing box observe whether the defects such as eccentric injury, stem injury, bushings and stuffing box can affect performance of packing. Also check whether other parts. Replace all the defective parts.
        2. Choose a suitable packing
        Packing in the selection must be taken into account two things.
        Packing condition and performance requirements should match. According to the relevant technical data can be selected to meet the requirements of the Packing. If in doubt, consult a sales representative.
        Seal requirements must be based on the correct choice of Packing’s Size. In order to determine the cross-section, please use the following formula calculations: Cross-section=( Stuffing box Diameter- Stem Diameter)/2
        In order to compensate for injury may require the installation more larger cross-section of thepacking.
        3. Cutting and installation
        Cut off by cutting mechanical precision required length of the Packing ring. If there is none of mechanical,underL=(D+S)X1.07X丌 for cutting. General rotation axis, with 90 ° cutting straight; valves on the cutting 45 °. Never attempt to stuffing box with packing around to determine the length. Otherwise will be in the Packing around the same with the stem of a pipe OD, and it"s tightly repressed, but not tensile it. Then cut its kind ring
        , and test whether it can accurately fill space. And ensuring that its interface does not have gaps. Central then can be used like other cutting as a standard packing rings. If these products in the plane completed, if the packing is soft or easily deformed, can be produced in accordance with a small ring-like scallops, and then according to the rope to produce the remaining filler ring.
        When the packing for valve, packing section’s space and the same of the valve, surcharging central is the best.when for pump, packing section and valve space, packing to a shaft and a leaking space is conducive to lubrication and cooling.
        One-time installation packing rings, must fill each convinced that no dust or other debris viscosity. If you need, packing rings should be used in stem on the same clean lubricating oil to be. Each installation staggered packing rings 90 °Central started slowly in the axial, the radial distance to axis can be loaded to the central. Fill tool use professional to fastening packing rings. When the installation is complete,grand stretched its valve on the Stuffing box until 25% of the thickness of packing, pump 50% of the thickness. Follow-up pieces use of its closed, can increase tightness. Remember, follow-up pieces were only as a supplement, cab ensure that all appropriate packing rings position to avoid packing mobile.


        Reciprocating pumps, fill the box at both ends and intermediate orientation should Add to Central, to maintain its concerted campaign by the plunger and gravity.
        按此在新窗口瀏覽圖片 按此在新窗口瀏覽圖片 按此在新窗口瀏覽圖片
        4. Rotating and reciprocating pump start
        Before operation, Load first state in the absence of commissioning,Observation of atypical,then official car, careful observation, there is no pressure or hard.and causing serious leak or burn filler phenomenon. Pump startup that is the key to its leakage at the beginning. If one started to leak Pan-gen without fastening to the state, will lead to leakage burns packing.
          Fill in the ring after installation, twisting bolts, and recognizing the filler material covered me with the right of joint. Once Bolt, it is necessary to ensure that all the bolts of the uniform.
          If the application of an external lubrication system, that should be prior to the commencement of its operation to correct.
        Startup allows leakage rate. In the process, the Pan-gen Yasui and begin work.
          After running about 15-30 minutes, until once again Setscrew allowed to leak. Recommended leakage of 8-10 points / minute. Tetrafluoroethylene filler should be allowed to export a greater flow of heat to reduce thermal expansion.
        5. Valve launched
          Most, zero leakage valve design.In order to achieve this, we must refer to the pressure valve in the fastening of the filler completely.
        6. Valve Installation Guide with Packing
        a. Pump used in strict accordance with the Pan-gen Installation Guide to operate;
        b. Rotating around the valve to ensure that the bolt free rotation;
        c. Check valve operation, if found leakage reference to the relevant safety procedures and maintenance vendors recommend appropriate adjustments.

         
        Print】 【Back
         
        All rights reserved by www.nfnkzx.com
        Tel:0086-577-86928956 86928957   Fax:0086-577-86928955   E-mail: sales@wskmj.com  Add: Xi'an Zone, Chuanliao Town, Lishui City, China
         
        中文字幕无码无码专区| 精品无码一区二区三区爱欲| 亚洲色无码播放| av无码播放一级毛片免费野外| 天堂在线观看中文字幕| 欧日韩国产无码专区| 人妻中文无码久热丝袜| 亚洲色成人中文字幕网站| 秋霞无码一区二区| 日韩av无码免费播放| 久久亚洲精品中文字幕| 午夜亚洲av永久无码精品| 日韩AV无码久久一区二区| 无码国内精品久久综合88| 亚洲乱码中文字幕综合| 免费a级毛片无码| 久久久久久久亚洲Av无码| 国产成年无码AV片在线韩国| 亚洲国产精彩中文乱码AV| 亚洲精品无码永久在线观看| 国产精品无码AV一区二区三区| 亚洲国产无套无码av电影| 日韩精品无码免费专区午夜| 精品久久久久久久久久中文字幕| 中文字幕乱码一区二区免费 | 中文字幕无码第1页| 国产精品成人无码久久久久久| 亚洲AV无码欧洲AV无码网站| 国产色综合久久无码有码| 亚洲中文字幕无码一去台湾| 精品久久久久中文字| 最近新中文字幕大全高清| 最好看2019高清中文字幕| 最近2019免费中文字幕视频三| 无码中文人妻在线一区二区三区| 欧美巨大xxxx做受中文字幕| 中文字幕乱码免费视频| 亚洲日韩中文无码久久| 痴汉中文字幕视频一区| 中文无码久久精品| 无码中文字幕日韩专区视频|